The contract work in this contract consists of a open air zone in the northern part of the E45 Kløfta project. A new road shall be constructed, which starts approx. 1.1 km north of the new bridge over the Eiby River.
_ Forest clearing the entire route, as well as a landfill and road to a landfill site.
_ Alterations of the current road to the existing road in the southern part.
_ An interim bridge/road to a bridge and cradle in the north shall also be constructed, with crossing.
of the Eiby river.
_ Preparation of landfill sites. As well as a road to the landfill approx. 3 km north of the site start at
Garajohka.
_ The transmission of electricity is carried out under the direction of the line owner who is Alut.
The new E45 shall be constructed as a road with main road standard with dimensioning class H1,
road width 9 metres and a speed limit of 90 km/h.
The traffic on the stretch has an annual daily traffic count of approx. 900, with a heavy traffic share of 22%. The project will be implemented model-based. Tenderers shall use professional models as work basis and to obtain placement and stitching data. In addition there are drawings that provide supplementary information on details.