The project is a deep retrofit and extension of the existing dwelling at 15 Cappa Drive, Kilrush, Co._Clare for Brothers of Charity Services Ireland. It involves controlled demolition of the defective rear extension, chimney, external escape stair and part of the front porch, and the construction of a new two_storey rear extension. Internally the layout will be reconfigured with replacement stairs and the floor level in the existing granny_flat area raised to match the main house; openings will be widened, windows and doors replaced, and new roof_light openings formed. The works include complete replacement of the heating and electrical systems with an air_to_water heat_pump, low_temperature radiators, full rewire and demand_controlled ventilation, along with deep retrofit measures (insulation, airtightness, triple_glazed windows) to meet BER B2 and ensure compliance with current Building Regulations. Fire safety will be upgraded to an L1 detection system with emergency lighting and FD30S doors, and accessibility will be improved by providing an accessible WC, level_access shower and ramped front entrance. External works include constructing an accessible ramp, patio to the rear and footpaths.
45000000: Bauarbeiten
Jahre
Tage
Stunden
Minuten
Sekunden