Details zur Ausschreibung

Trandum cooling tower

A new cooling system shall be constructed for the four test cells in the engine test station at Trandum, as well as the existing supply air and exhaust fans in accordance with. the ventilation of the test cells shall be replaced. The system in the new facility shall fulfil the current requirements for environment and energy use, remove the risk of infection spreading from the plant, optimise predictability, and thereby safeguard the operational safety so that the user can carry out his assignment. The existing cooling tower shall be removed and replaced by a cooling system based on open wells (ground water), network water and dry coolers. The total cooling capacity is 3000 KW. The return water shall be returned to the ground water surface at Transjøen, but must be drained so that the temperature of the water is lowered for reasons of water environment, bio diversity, microorganisms, etc. before it is returned to the ground water. The construction will mainly be the demolition of cooling towers as well as the assembly of 3 simple superstructures for the extraction wells at Transjøen.


Haupt-CPV-Code

45331230: Installation von Kühlanlagen

Stammdaten

  • -

    Jahre

    -

    Tage

    -

    Stunden

    -

    Minuten

    -

    Sekunden

  • Ende der Frist: 20. November 2025, 11:00
  • Veröffentlicht am: 21. Oktober 2025
  • Vergabeart: Offenes Verfahren
  • Auftraggeber: Forsvarsbygg
  • Art des Auftrags: Bauauftrag
  • Dokumentennummer: 2025/3157
  • NUTS-Code: NO084
  • Zum Original Link
  • Status: Aktiv
Diese Webseite nutzt Cookies, um bestmögliche Funktionalität bieten zu können. Details finden Sie hier.