Details zur Ausschreibung

TBESS EPC

The subject matter of the contract is the engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 80 MW of active power consumption and feed-in and a usable storage capacity of at least 160 MWh at the time of commissioning. It also within the allocated land plot. includes the inverters and transformer stations since there is 33 kV voltage at the grid connection point, as well as the electrical connection 33kV switching station up to the connection point at the point of connection of the transformer stations to the grid connection point and all ancillary equipment and infrastructure necessary for proper and safe operation. Construction will take place on the site of Trianel Batteriepark Waltrop GmbH & Co. KG (TBW) in 45731 Waltrop, Germany. For further information please see tender documents.


Haupt-CPV-Code

45000000: Bauarbeiten

Stammdaten

  • -

    Jahre

    -

    Tage

    -

    Stunden

    -

    Minuten

    -

    Sekunden

  • Ende der Frist: 24. November 2025, 11:00
  • Veröffentlicht am: 20. Oktober 2025
  • Vergabeart: Verhandlungsverfahren mit vorheriger Veröffentlichung eines Aufrufs zum Wettbewerb/Verhandlungsverfahren
  • Auftraggeber: Trianel BESS 1 GmbH & Co. KG
  • Art des Auftrags: Bauauftrag
  • Dokumentennummer: 20251014_TBESS EPC
  • NUTS-Code: DEA36
  • Zum Original Link
  • Status: Aktiv
Diese Webseite nutzt Cookies, um bestmögliche Funktionalität bieten zu können. Details finden Sie hier.