The existing Ose bridge is an older suspension bridge that does not have either the strength or width of larger vehicles. Most of the work is to construct a new Ose bridge and to demolish the existing suspension bridge. In addition there will be road laying at both ends of the bridge. A total of approx. 160 metres.
In addition an option will be taken to alter approx. 750 metres of national road 9 and construct approx. 350 m foot/cycle path along highway 9 for the Norwegian Public Roads Administration.
45000000: Bauarbeiten
Jahre
Tage
Stunden
Minuten
Sekunden